Nearing the end of the project I have felt more stressed than ever. With the deadline being right around the corner. With so much to do not only in this class but all the other ones as well with the deadlines being next week. We have only the second draft of our conclusion and discussion left to work on for the paper. The other part we have to work on is our website. With the disconnection with our mentor that was helping us with the raspberry pi, we had talked with our teacher about having moving to it being installed till after break to allow more time on figuring out how to work the raspberry pi. With all this said we are planning on working on the discussion on Monday of next week and the conclusion with the our teacher’s first rubric of it on Tuesday. On Wednesday we are going to look over the website and add anything else that is needed. Connor and I had noticed that the crested geckos had started to get thinner. In a hurry we had done some research and had found out that it is normal for crested geckos to get thinner during the winter months. So we are planning on monitoring them closely and making sure that they aren’t that thin when winter is over. Tags:#Information Literacy#Collaboration
0 Comments
Leave a Reply. |
AuthorSConnor O'Clair Archives
January 2019
|