This week we have been working on our methods and is due tomorrow. Not to our advantage my entire class had lost all of yesterday and today to a new standardized test called the pilot test. Usually testing isn’t a problem due to it wouldn’t be right around a due date for a major part of our capstone and this test doesn’t time limit due to it being such a new test they want to give us as much time as possible. Which is good since it is a new test and will allow us to explore the test and figure it out. On the other hand, we are losing two class days to work on our methods and the due date for our methods is still tomorrow. To add on to it I had already signed up for to donate blood during my class period. Lucky in the end Connor and I were able to pull it off. During the period before we both had finished our assignments in that class and was able to finish the review packet that is due tomorrow. This will allow us tomorrow to review it and then hand it in. even though we are able to pull this off doesn't mean we are in the clear just yet. Next Wednesday we have the experimentally design due. This will include our methods, procedure, martials, background knowledge, etc. This will be the other major writing section that will be completed for capstone one and if all goes according to plan Connor and I will be ready to get the reptiles and building materials to renovate and make the enclosure operationally once more. Something I’m worries are about the raspberry pi. My main concern is the lack of knowledge and research we have been able to do on the topic and devices. Due to writing the literature review, methods and doing assignments from other classes Connor and I have had little time to do any major research with them. We might have to learn as we go in capstone II or do some learning over the summer.
Tags: #Collaboration#Communication#Information Literacy
0 Comments
Leave a Reply. |
AuthorSConnor O'Clair Archives
January 2019
|